Progress Report from 30/11/2015 to 07/12/2015
Completed Tasks:
– Modify the boards in order to test different impedance matching configurations: 1 board configured for driver strength and other board in a Series Termination Scheme;
– Testing of the performance of both boards in the Ranging and Transceiver configurations.